Design Phase: Adopt 3D real-time rendering + intelligent order splitting tools. Users and designers view 3D effects synchronously (supports AR placement in their own floor plans); after confirming the plan, the system automatically splits it into production drawings (including panel sizes and hardware models) to avoid manual splitting errors.
Production Phase: Connect to flexible production lines; order-splitting data is directly transmitted to CNC equipment for “one person, one order, one code” production. A pre-production material verification link is set up to reduce material errors and omissions.
Installation Phase: Implement factory pre-assembly + digital installation guides. Complex furniture (e.g., wardrobes) are pre-assembled into core modules in the factory, with mobile AR installation steps (marking hole positions and hardware installation sequences), reducing on-site installation time by 60%.
3 node confirmations (design draft, production draft, pre-assembly) are set throughout the process to reduce rework rates from the source.